Agilent Technologies 1100 Series Manual de Serviço Página 23

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 318
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 22
1100 Series DAD and MWD Reference Manual 23
Installing the Detector 1
4 Connect the power cable to the power connector at the rear of the detector.
5 Connect the CAN cable to other Agilent 1100 Series modules.
6 If a Agilent ChemStation is the controller, connect either
the GPIB cable to the detector or
the LAN connection to the LAN interface board in the detector.
7 Connect the analog cable(s) (optional).
8 Connect the APG remote cable (optional) for non-Agilent 1100 Series
instruments.
9 Turn on power by pushing the button at the lower left hand side of the
detector. The status LED should be green.
Figure 5 Front View of Detector
Line power switch
with green light
Status indicator
green/yellow/red
NOTE
If a Agilent 1100 DAD/MWD/FLD is in the system, the LAN/GPIB should be connected to
the DAD/MWD/FLD (due to higher data load).
Vista de página 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 317 318

Comentários a estes Manuais

Sem comentários