
© Agilent Technologies2000–2003 Agilent 3070 / 79000 DUT Power Supply Installation 35
Installing DUT Power Supplies
Installing the DUT Power Supplies in a 79000
System
These procedures describe how to install a DUT supply
in a 79000 testhead. The cables for both the 6624A and
6634A/B are installed in all 79000 testheads, even if
DUT supplies are not factory installed. All necessary
hardware is shipped attached to the cradle in the left pod
to install each of DUT supplies.
In the 79000 system, the DUT supplies are mounted in
the pod on the right end, when viewed from the back of
the system, as shown in
Figure 14 on page 36. The
6624A (E3785A faceless DUT power supply), and up to
two 6634A/Bs (1-output high voltage E4034A DUT
power supply) may be installed in the 79000 system. If
there is only one 6634A/B, it is installed in the middle
position. The face down 6634A/B is installed next to the
cradle wall. The 6624A is installed in the outside
position.
NOTE
If two 6634A/Bs are installed, the face down
6634A/B must be installed before the middle
6634A/B due to access constraints.
Comentários a estes Manuais