Agilent Technologies 1100 Series Guia de Instalação Página 94

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 184
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 93
1100 LC Modules Control Manual - 94 - 03-914947-30:Rev.6
Starting and Viewing an
Acquisition
Quick Start and Sequence
Once the instrument control method has been correctly
programmed, an analysis can be started. The next section briefly
describes how to start an acquisition.
Quick Start (Single Acquisition)
1. Press the button.
In the Quick Start window, select the system, the method
and optionally the project if connected in "All project" mode.
2. Press the OK button.
The following screen is displayed:
Vista de página 93
1 2 ... 89 90 91 92 93 94 95 96 97 98 99 ... 183 184

Comentários a estes Manuais

Sem comentários