
Network Testing with the FrameScope Pro 2
N2620A User’s Guide 49
General Settings for the Master FrameScope Pro
Before the start of any performance test, follow the procedure
below.
1 Connect two FrameScope Pro units or a FrameScope Pro
with a loopback device at each end of the desired network.
Refer to Chapter 1, “Connecting to the Network and Using
the FrameScope Pro” on page 14.
2 Press To ol s on the Main Menu screen of the master
FrameScope Pro.
3 Press Performance Tests on the Tools menu. You can select the
desired test from the Performance Test menu.
Comentários a estes Manuais