Agilent Technologies, Inc.
DisplayPort Test Implementation Group 9 Agilent J-BERT N4903B & 90000A/X/Q Series Sink Draft2
Sink Jitter Tolerance Test (4.1)
6 Pre-test Procedures:
Prior to making any measurements, the following steps must be taken to assure accurate measurements:
Allow a minimum of 45 minutes warm-up time for oscilloscope and J-BERT N4903B
Ensure the oscilloscope and skew is calibrated per Agilent’s user documentation on calibration.
Make sure you use a torque wrench with the proper torque specification to make all SMA connections.
7 Test Objective
The DisplayPort PHY CTS 1.2b Section 4 outlines the requirements for Sink testing.
8 Test Conditions
Refer to Section 4.1.3 of the PHYCTS 1.2b for the verbose details of the test conditions. Table 1 below is
a summary of these conditions for each data rate.
The value of the transition time converter used for the main link depends on
the channel + TTC combination used to achieve the required compliance
interconnect channel ISI, see 9.1.
Comentários a estes Manuais