Agilent Technologies 42A Especificações Página 35

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 34
35
Chapter 3: Testing Performance
To Set Up the Test Connectors
To Set Up the Test Connectors
The test connectors connect the logic analysis system to the test equipment.
Materials Required
1 Build three test connectors using BNC connectors and 6-by-2 sections of
Berg strip.
a Solder a jumper wire to all pins on one side of the Berg strip.
b Solder a jumper wire to all pins on the other side of the Berg strip.
c Solder two resistors to the Berg strip, one at each end between the end
pins.
d Solder the center of the BNC connector to the center pin of one row on
the Berg strip.
'HVFULSWLRQ
5HFRPPHQGHG+3
$JLOHQW3DUW
4W\
%1&I&RQQHFWRU 
UHVLVWRU 
%HUJ6WULSE\
%HUJ6WULSE\
3UREH $
-XPSHUZLUH
Vista de página 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 167 168

Comentários a estes Manuais

Sem comentários