Agilent Technologies Weather Radio 1680 Manual do Utilizador Página 22

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 21
22
Chapter 3: Testing Performance
To make the test connectors
f On two of the test connectors, solder a 20:1 probe. The probe ground
goes to the same row of pins on the test connector as the BNC ground
tab.
2 Build one test connector using a BNC connector and a 17-by-2 section of
Berg strip:
a Solder a jumper wire to all pins on one side of the Berg strip.
b Solder a jumper wire to all pins on the other side of the Berg strip.
c Solder the center of the BNC connector to the center pin of one row on
the Berg strip.
d Solder the ground tab of the BNC connector to the center pin of the
other row on the Berg strip.
Vista de página 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 173 174

Comentários a estes Manuais

Sem comentários