Agilent Technologies VEE Pro Guia do Utilizador Página 396

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 602
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 395
368 VEE User’s Guide
10 Test Sequencing Chapter
Click OK to close the dialog box. You will see the transaction
test1 0 <= (.25) <= .5
on the first transaction bar. This means that test1 will pass if
the returned value is in the range from 0 to .5 with the end
points included. The expected result is about .25.
4 Run the program. It should display the name of the test, the
test result, and the pass- fail indicator (1 for PASS, 0 for FAIL)
in the display, as shown in
Figure 204.
Figure 204 Configuring a Test
Before proceeding, study Table 203 to understand the
various choices in the Sequence Transaction dialog box.
Open the dialog box again by double- clicking on the
transaction bar. Open the various menus and read about the
different options.
Vista de página 395
1 2 ... 391 392 393 394 395 396 397 398 399 400 401 ... 601 602

Comentários a estes Manuais

Sem comentários