Agilent Technologies E1356A Manual de Serviço Página 35

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 68
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 34
LO to Chassis Leakage 1. Make Hardware Connections
Turn power supply and mainframe power OFF
Connect DMM, power supply, and resistor as shown in
Figure 2-10
Turn power supply and mainframe power ON
2. Check Direct Terminals Leakage Current
Send *RST to FET Multiplexer
Send TRIG SGL to DMM
Record the DMM reading in Table 2-1
Positive Polarity, LO to Chassis, Direct
The DMM measurement should be less than 0.010 Vdc.
A measurement out of this range indicates a failure of the
FET Multiplexer.
3. Check Channels Leakage
Send CLOS(@nn00) to the FET Multiplexer, where nn is the
card number (typically 01)
Send TRIG SGL to DMM
Agilent E1300B/E1301B
Figure 2-10. Positive LO to Chassis Leakage Connections
Verification Tests 2-17
Vista de página 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 67 68

Comentários a estes Manuais

Sem comentários